01902 893252   |   info@cjzconsulting.co.uk
CJZ Consulting Planning Development Architecture
Planning

Flood risk and planning applications

The location and vulnerability of the proposed use determine the level of assessment required.

Why this matters

The location and vulnerability of the proposed use determine the level of assessment required. The practical issue for most clients is deciding what information is needed, when it should be commissioned and how it supports the overall planning strategy.

A coordinated approach

CJZ would review the planning history, policy position, physical constraints and available evidence before recommending a proportionate route forward. This can avoid unnecessary work and ensure that the strongest issues receive the most attention.

Next steps

For project-specific advice, provide the site address, a brief description of the proposal and any relevant decision notices or drawings.

Speak to CJZ →